Wednesday, January 30, 2008
Inside the building the heat pump is being installed. It is a heavy piece of kit and took everyone here today to move it into the utility room. We've agreed its final position and from there Steve and I can order the utility room cabinetry. In a few days time the heating will all be connected and set to work. It'll take quite few days to come through as the pipework is deep in the slab but this will help dry the concrete before we look to putting flooring down. It'll also help to warm the rest of the house. Before the electrician left earlier he switched the heat recovery system on as it is now in place. We're pleased to report it is silent in its operation.
Tuesday, January 29, 2008
Still raining in Scotland
Where to begin? Like many 'phone conversations and chats if you speak to someone often enough you catch up on lots of news but if you haven't spoken to them for a while you can't think of a thing that you've done. As we've been in our friend's house for a week and have now moved to a holiday house nearby we're not on the internet so blogging has been sporadic in the past 10 days. Activity at the farm has been considerable so we'll let photos explain where we're at.

One of the past day's issues is the internal wallhead height in the upper rooms. As the house is 1.5 storeys the trick is to achieve a well-balanced room which is usable without looking like a triangle and providing lots of awkward corners. The architect has proposed 1.55m wall head in the master bedroom but we personally have huge difficulties 'wasting' all that floorspace behind the joinery/plasterboard. The elevation shown looks west; here we've agreed with the joiner not to put any internal joinery on that side, other than boxing out the flue which can be seen, but to reduce the wallhead on the east elevation to 1.35m. This still entails the 'loss' of floorspace but provides proper walls for placing a bedhead against. The second photo shows the framework in place for that. On one of the landings we're creating an eaves storage cupboard. We're hoping to achieve optimal usable floor space and create a desirable room.
The second photo looks east and shows the framework now at 1.35m, this will be plasterboarded imminently.
Downstairs and the hallway looks a little less finished.
Tomorrow the heating guys return to start work on the heat pump installation in the utility room. Jim, the electrician is connecting the last elements of the heat recovery ventilation system upstairs and will then move downstairs. The wood burning stove arrives tomorrow and the final long lost window arrives. The slates were finished last week and look grand.
Monday, January 21, 2008
We've spent the last three nights in our friend's house and it has been really lovely! Terrific to have warmth, spacious bathrooms, properly hot water, a real fire and plenty of space. I cooked a gorgeous roast dinner yesterday, the first for 7 months at least and it was much appreciated.
Various people have been working on site this weekend as we had pretty good weather. Most of the leadwork to the windows is complete, with just the remainder of the dormer to finish off when it has stopped raining....today is very wet and very cold. The groundworks crew are back and have been building the external brickwork up on the east elevation. Today, inside the house, installation of the ventilation system continues and the joiners have commenced work on the plasterboard ceilings on the upper floor. The slaters haven't progressed too much today because of the weather and unfortunately the rest of the week doesn't look too kind either.
Various people have been working on site this weekend as we had pretty good weather. Most of the leadwork to the windows is complete, with just the remainder of the dormer to finish off when it has stopped raining....today is very wet and very cold. The groundworks crew are back and have been building the external brickwork up on the east elevation. Today, inside the house, installation of the ventilation system continues and the joiners have commenced work on the plasterboard ceilings on the upper floor. The slaters haven't progressed too much today because of the weather and unfortunately the rest of the week doesn't look too kind either.
Wednesday, January 16, 2008
Grand Designs
Good to see Grand Designs back on TV this evening as it was always inspiring before we even thought of building. My overwhelming reaction isn't about the house though - just that the programme doesn't convey the zillions of decisions self-builders make. Obviously from an entertainment point of view it never will as it would make very dull viewing indeed but every day involves so many decisions, not a stressful thing as such but amazingly time absorbing. Thank goodness for t'internet.
Photos
One happy hen, good to see the sunshine again. Although freezing at night time.
One house with vapour membrane complete. Imagine the condensation and damp here without a ventilation system in place. No draughts though.
One gorgeous view from our bedroom window.
One selection of electrical tagliatelle feeding into the utility room.
One snapshot of infrastructure to the master bedroom en-suite. Heat recovery ventilation, hot and cold water feeds and returns, underfloor heating and soil pipe.

Good weather = Good Progress
Afterwhat has seemed a long spell of dreich weather, the sun finally came out today and the slaters made significant progress on the roof, now about 75% slated. Inside the joiners completed the poythen vapour membrane work on the 1st floor such that we now have a near airtight house.
As I have mentioned before airtightness is an essential element in low energy housing; it allows the insulation to work properly, prevents draughts and ensures that ventilation can be properly controlled. The old adage 'insulate tight - ventilate right' has to be the watchword for the eco-selfbuilder, and if planned and implemented properly, will go a long way to achieving significant savings in energy even before considering renewable energy systems and high efficiency boilers.
Sunday, January 13, 2008
Rambling catch-up
Have realised that I haven't taken any new pictures in the past few days...sorry! Lots happening though so here's a random list....
We've taken deliveries of towel radiators (Molly had requested a purple one for their bathroom but thankfully B&Q haven't realised there's a market need out there yet); three Grohe showers purchased online from Bathrooms365; we've also purchased two bathroom units from B&Q, with slightly adventurous acid lime coloured fronts; and there is a shower tray on the way which should complete all purchasing for the bathrooms except for flooring and tiling;
The kitchen design is being tweaked hither and thither but we are hoping to be making a decision by the end of next week, essentially the decision is between Magnet and John Lewis; both have been good on customer attention so far and both have well manufactured products, the latter have a slightly better selection of unit sizes which is a plus point but we haven't had the final quotes yet!
The search for slate floor tiles and hardwood flooring is next (Steve's job) and also for sliding wardrobes for the bedroom and hall (my job); when we finish this house build we should have so much spare time...I wonder?
On site the work on installing the Heat Recovery Ventilation system ducting has commenced. Steve spent a bit of time with the electrician as the system was new to him, I don't pretend I can explain the detail so will let the engineer expand on that soon. The principle is that the house is so well insulated and airtight that ventilation is an important requirement, and the system we are installing continuously extracts stale, warm, moisture laden air from the house and replaces it with fresh air from outside, transferring the latent heat from the former to the latter in the process . Other electrical work is largely complete for this stage with the positions for electrical sockets and other outlets for lighting, telephone, DAB, SAT/TV, RJ45 (computer network - CAT5e cabling) all firmed up. Thankfully we'll be having some of those neat multimedia sockets so the house doesn't look like an electrical showroom.
I have been striving to get quotes from landscaping firms to undertake some tree planting around the perimeter before the current planting season is over. I am submitting an application for a grant scheme which the National Park operate and although the rules are numerous I hope to get some help towards improving the local landscape. In addition I have been perusing the website of Butterworths which is an Ayrshire based organic apple nursery. Last year I missed the planting season but want to get 12 apple trees planted shortly with a mix of eating and culinary varieties. The hens currently occupy the orchard plot in its bare and bleak state so I'm sure they'd welcome the trees. Butterworths is a really specialist and very well regarded small nursery and they have many old Scottish species which I hope we can have here. I shall include a cider variety too so that we can dust off Steve's Vigo apple press in future Autumns.
And finally..we did watch some TV this week and were pleased to see the Hugh FW and Jamie Oliver programmes on chickens. Obviously we are pleased to have our own former battery hens which have flourished and are still laying eggs through the winter. We don't have chicken very often because organic is expensive (but delicious) but we are wondering whether to get some chickens for the table as well as for their eggs.
5 more nights in the caravan ('til mid March anyway).......
We've taken deliveries of towel radiators (Molly had requested a purple one for their bathroom but thankfully B&Q haven't realised there's a market need out there yet); three Grohe showers purchased online from Bathrooms365; we've also purchased two bathroom units from B&Q, with slightly adventurous acid lime coloured fronts; and there is a shower tray on the way which should complete all purchasing for the bathrooms except for flooring and tiling;
The kitchen design is being tweaked hither and thither but we are hoping to be making a decision by the end of next week, essentially the decision is between Magnet and John Lewis; both have been good on customer attention so far and both have well manufactured products, the latter have a slightly better selection of unit sizes which is a plus point but we haven't had the final quotes yet!
The search for slate floor tiles and hardwood flooring is next (Steve's job) and also for sliding wardrobes for the bedroom and hall (my job); when we finish this house build we should have so much spare time...I wonder?
On site the work on installing the Heat Recovery Ventilation system ducting has commenced. Steve spent a bit of time with the electrician as the system was new to him, I don't pretend I can explain the detail so will let the engineer expand on that soon. The principle is that the house is so well insulated and airtight that ventilation is an important requirement, and the system we are installing continuously extracts stale, warm, moisture laden air from the house and replaces it with fresh air from outside, transferring the latent heat from the former to the latter in the process . Other electrical work is largely complete for this stage with the positions for electrical sockets and other outlets for lighting, telephone, DAB, SAT/TV, RJ45 (computer network - CAT5e cabling) all firmed up. Thankfully we'll be having some of those neat multimedia sockets so the house doesn't look like an electrical showroom.
I have been striving to get quotes from landscaping firms to undertake some tree planting around the perimeter before the current planting season is over. I am submitting an application for a grant scheme which the National Park operate and although the rules are numerous I hope to get some help towards improving the local landscape. In addition I have been perusing the website of Butterworths which is an Ayrshire based organic apple nursery. Last year I missed the planting season but want to get 12 apple trees planted shortly with a mix of eating and culinary varieties. The hens currently occupy the orchard plot in its bare and bleak state so I'm sure they'd welcome the trees. Butterworths is a really specialist and very well regarded small nursery and they have many old Scottish species which I hope we can have here. I shall include a cider variety too so that we can dust off Steve's Vigo apple press in future Autumns.
And finally..we did watch some TV this week and were pleased to see the Hugh FW and Jamie Oliver programmes on chickens. Obviously we are pleased to have our own former battery hens which have flourished and are still laying eggs through the winter. We don't have chicken very often because organic is expensive (but delicious) but we are wondering whether to get some chickens for the table as well as for their eggs.
5 more nights in the caravan ('til mid March anyway).......