A continuation of the previous blog - the technology sometimes prevents such things.
The step shown left was finished on Friday. The stone for the whole wall and the step has been recovered from the demolished farmhouse save for the coping stones which have been bought from a nearby farm where the wall had fallen down.
The weather forecast for later in the week is distinctly cooler with daytime temps nearer zero and we have had our first conversations around the subject of 'how long can we/will we stay in the caravan'. No decisions to move out yet as most of the time its really not difficult. Naturally we would prefer more space and a lovely big bathroom but that is, quite literally, a work in progress. The office is in an old toolhouse adjacent to the barn which adjoins the house and with its high level of insulation it is a very pleasant place. Steve has been insulating the water pipes within the caravan and we need to tackle the ones outside where they are not underground.