Thursday, March 22, 2012

The Old Dairy - Interiors

The buff stone featured above was crafted to snugly fit a void in the red sandstone wall on the west gable of the two bedroomed cottage. It fits well with the building and the natural tone of the original stone.
We've also got some interiors shots to show you...



This view is taken from the first floor landing, the open plan living space in this cottage has the full height of the building and lots of natural light, it really feels good in here.
Beds have crisp fresh white linen topped with stylish throws, some cotton, some silk. In this cottage oak is the predominant material and features in every room, further adding to the warmth and beauty of the place.
In the kitchen we have all the usual bits you would expect, yes there's a dishwasher, hob, oven, fridge and kit like a toaster, kettle and plenty of crockery, glassware, pots and pans. There will be some welcome goodies to greet guests. Happily the hens have started laying again now the daylight hours are longer so we'll be including a complimentary half dozen for holiday guests, zero food miles and they taste absolutely gorgeous (in our humble opinion).

The first floor landing leads to a double bedroom with ensuite. The landing overlooks the living space in a rather grand fashion and you can look straight out a high level window which looks across the fields with views of the Campsie Hills.
We hope you like it!

Friday, December 9, 2011

Here's How We're Doing

A flurry of snow, beautifully clear skies, sunshine and a hurricane all in 24 hours. Work on site with the two holiday cottages has progressed well and we're pleased to dust off the blog to show you some updated photos.
The view here of the cottages from the east shows the two bedroomed stone building on the left of the photo and the four bedroomed one on the right. The larger cottage is finished partly in white render and will also have larch clad areas on the unfinished section you can see. The brown material visible is Pavatherm which is a compressed wood fibre board used as an external insulation material. That area will be larch clad which will age fairly quickly to a mellow silvery grey. The materials used fit very well with the local vernacular and have also been used on our own house. The red sandstone is well over 150 years old and is typically 2feet thick. The official naming of the two bedroomed cottage...

We commissioned a name stone which is placed high on the west gable of the cottage. I'm really pleased with the way the whole building looks now, the cleaned up stone is looking all the more splendid in the winter sunshine. For a quick reminder of how it looked check here.

Both cottages have access ramps and at grade entrances for wheelchair users. They also have plenty of big windows to maximise those views of our beautiful surroundings, being strong on energy conservation the windows are Argon filled double glazed with sustainable timber frames.The interior of The Old Dairy. The living space is a full height room with high level windows as well as ground floor sliding doors to the patio. You can just see the pipe which will serve the wood burning stove on the left.
The living space of the larger cottage is impressively large and, again, has big windows for big views.


The view below is of the Campsies (to the south-east) from one of the bedrooms.


One kitchen....

Solar thermal panels on the south facing roof....


and photovoltaic nicely generating electricity to serve both cottages.



































Thursday, April 2, 2009

Fabrics and finishes

Voyage Chantal in Mulberry was chosen for the only curtains in the house........


This fabric pear was a Christmastime purchase from Snapdragon.
Oak, reflections, glass and textures in the master bedroom.








Below the fluffy mongolian sheepskin cushion sits on top of a lilac cube enhanced by trimmings and embroidered pieces from the Voyage Eden used on the headboard....as lovingly sewn on by our friend.


Bright breezy and beautiful Voyage Eden Multi fabric used on bed headboard.








Sanderson Honesty Victoria Plum in a linen/cotton mix was used on the 1.8m wide blind for the master bedroom.

Tuesday, June 17, 2008

One year since moving here


It was one year ago this week that we moved from our old house, a Victorian sandstone place, into the caravan here. As we turned the key in the lock it started raining but we laughed as we set out on this journey of housebuilding. I know there are a few people reading this who are just commencing on that journey so I just want to say its so worth it, although unquestionably hard work, and to keep plugging away as you will get there. One year on and we're unpacking our worldly goods which have mainly been stored in one of the outbuildings here. Thankfully no damage has come to them after 12months+ of storage.

The newell caps are one of the snagging items - the design is excellent being square with a shadow band but unfortunately someone at the manufacturer has used indelible pen to mark the house name/contract number on the top. No-one is actually looking to deal with this so we're going to see if a joiner friend has any ideas. I think sanding it off isn't going to work as the pen has absorbed into the wood. Our on-site joiner tried rubbing it down but I think its one of those small items that we will end up sorting out as no-one else is 'taking ownership'!


These pics are of various internal finishes. There are lots of reflective surfaces, black glass and oak on the hall wardrobe illustrating the light coming through the windows in the dining area. The 'flowers on the wind' stickers coming from the velux window are from Pedlars. Door handles from Carlisle Brass. We bought all our velux blinds online at Bumblebee Blinds who seemed competitive and were certainly efficient.

Thursday, April 17, 2008

Not quite there yet...

The sensibilities of moving in tomorrow aren't really there as progress has been quite slow since our builder went on holiday last week. He's a very good project manager so I think it would all look a little further advanced if he'd been around. We perhaps 'ought' to wait another week but....the jobs fill the time available and Steve and I need to move in. The kitchen is messy but there isn't much left to do there and we could reasonably use it at the weekend after a good clean. The childrens' bedrooms are being carpetted tomorrow so we'll get their furniture in and blinds fitted on Saturday if possible with a view to that being our first night.

The granite worktop was fitted last weekend, just 2 weeks after templating, and we're very pleased with the result. The team were a very pleasant trio from Estonia and Lithuania. The plastic protective wrap on the doors and drawers is coming away on this photo and together with the general high dust and grime levels doesn't inspire but we reckon on using this kitchen this weekend. The caravan hob is just about adequate and the oven ok only for warming stuff. Last summer it took nephew Tommy Boy nearly an hour to part bake/part burn a pizza. We have managed to cook a good selection of food over the past 9 months, we've even entertained a few times, but a real kitchen is now beckoning.





Here's the wood shed (the biomass store!) which has been constructed from salvage timber, notably the joists from the original house and an oversupply of sarking board.
The roof elevation will be approx 2/3 covered by the solar panels.

Wednesday, April 9, 2008

The Contura wood burning stove in place in the main sitting room. We sourced this through EcoLiving who also supplied the ground source heat pump. The photo below is of the less attractive connection through the main bedroom to the chimney but this will be boxed in when the fitting is complete. This will still be a few days as the lower section of the external chimney and roof flashing need to be replaced because they have been damaged on site and a good seal with the internal pipes can't be achieved.

The slate tiles in the hallway will receive another coat of seal this weekend.

Just a short while left in our temporary home - we moved in here in mid June 07 and we're moving out next week. Its been pretty hard work at times and I can still feel the cold of the week before Christmas but being on site while the house has been built has been fun and essential.

Monday, March 31, 2008

Latest.....

The patio area around the southwest corner of the house - sunspot for summer days and evenings. It will be topped with black limestone slabs which are due to arrive on Wednesday-ish.
After much delay the American blond oak staircase has arrived but is needing some adaptations by our onsite joiner. The timber is beautiful though and despite the general mess in the house is one of the final landmarks in the building of the house.
The above photo is of the porch area by the front door. We've continued the larch cladding in this area which looks good with the height created by the continuation of the roof line. Jim the electrician is fitting the lights we've bought in the next day or so and this includes one to uplight this area, low energy of course!
Herewith the slate flooring in the family room which attaches to the kitchen/dining. I felt most sorry for the tiler who is trying to lay 82sqm of slate tiles whilst all around are busy with their own trades, typically on Friday this numbered around 12-15 people. At one point he locked the front door so no-one else could come in. The above slating has not been sealed but the bathroom has and the finish looks super. The floor will need resealing every 3-5 years but as this can be done with a mop and bucket it doesn't seem too onerous.

Wednesday, March 26, 2008

The construction of the 'commute' between the office and the house is underway (above) and the patios are being formed around the south gable (below).
Internally the kitchen is on its way. The installers are great, very flexible in their approach which is good because there's a few bits and bobs of adjustment to sort out as well as an evening trip to Ikea tonight to change the handles! The measurements in the utility room don't stack up properly so there's amendments needed there too.

Paint colours - redcurrant glory and simply pearl in the sitting room.

Monday, March 24, 2008

We walked up our local hill the Dumpling this morning which is always a pleasure, the view of Loch Lomond is awe-inspiring every single time. We've had lovely weather this weekend with tiny specks of dry snow sneaking in from the east. Yesterday was tiring as it was spent in town at various furniture/plumbing/DIY places so everyone was grumpy and fed up. Today has been filled with fresh air and sunshine with walks and outdoor activities. This afternoon we used some spray paint to mark out the areas immediately outside the house which will be hard landscaped for footpaths and patios, it wasn't too difficult (away from the cold easterly) to imagine summer evening barbecues. We then salvaged trailer-loads of wood from the site which are surplus to the build but will provide fuel for the wood burning stove for many years to come.

This week is massively busy with the kitchen and utility room fit-outs starting tomorrow, the external hard landscaping including sorting out the levels around the house will be underway, lighting is being fitted and the tiler continues with the ground floor slates.

There's no staircase yet, the design was in theory signed off in December, delivery 5 weeks thereafter, some apparent communication issue between architect and timber frame manufacturer whereby one expected measurements from the other which didn't happen, builder expecting delivery, calls not being returned.

Wednesday, March 5, 2008

Internal and External Finishes



We have had snow in the early part of this week but this isn't it! Here we're got the roughcasters flinging the wet dash render onto the east elevation. You can see where they completed one area at the end of last week as the mix dries whiter than when it is applied (thankfully otherwise we'd have a magnolia house!). Its a very messy task.






The larch cladding on the SW corner - this is really looking fabulous and we're very pleased with the choice of timber, its profile and the joiner's work. The timber frame company haven't been doing such a good job on the timely supply of the correct quantities of materials but this appears to being resolved after many calls from our builder. The timber itself has come from Russwood who are based in North Perthshire.












Not a great photo because of the light bounce but this is the toile negro tile which we choose for the ground floor bathroom. It looks terrific in place, especially in the shower with a single spot shining down.







one ensuite shower area












paint colour Winter Teal 5 for Finlay's room.......Dulux have done a fine job with that colour matching and shading/colour depth system as its a terrific marketing tool in providing the customer with thousands of options....so all our paint colours are coming from them and the marketing tool has worked!